Yeah sorry been getting a lot done. Paint is almost finished and it's looking great. All the HVAC is installed and operational. Next week or two it's floor sealing time in the station. Then final plumbing and that's everything but outfitting both buildings....
I'll try to get some photos up soon. Here's a teaser of the inside of the bays. We were able to color match the green using an old shelf board we demoed early on. And one of the outside- I painted the hose hangers and bay bumpers red since when I stripped off the old paint the original color was red.
Attached Images