What are you guys putting in the ground for a base for your big signposts? octagon post 21ft. with side hanging mobil shield. thanks Rick
|
|
|
Please - NO offers to Buy or Sell in this forum category
Statements such as, "I'm thinking about selling this." are considered an offer to sell.
|
|
#56161
Wed Nov 23 2005 11:49 AM
|
Joined: Jun 2004
Posts: 142
Petro Enthusiast
|
Petro Enthusiast
Joined: Jun 2004
Posts: 142 |
If you measure the holes in the base of the sign post, that will give you an idea of the diameter you're going to need. If you pour a pad of concrete, a wedge anchor is probably the simplest choice. For the ultimate in strength an adhesive anchor with a length of B7 threaded rod is by far the strongest. If you pour concrete, it takes 28 days for the stuff to full cure. The earliest you can install a wedge anchor is 20 days. Installing any sooner and you compromise the full working strength of the anchor. With a 21 foot post, it will likely see some heavy wind loads; so be conservative. Also remember deeper is generally better when it comes to the performance of any concrete anchors. http://www.ramset-redhead.com/trubolt.asp ------------------ -Dave- Slowly progressing on a '54 Tokheim 39
-Dave- Collects Dino era Sinclair & Mopar items
|
|
|
#56162
Wed Nov 23 2005 11:49 AM
|
Joined: May 2005
Posts: 276 Likes: 1
Petro Enthusiast
|
Petro Enthusiast
Joined: May 2005
Posts: 276 Likes: 1 |
Rick, i am in the process of doing the same thing with a mobil shield. At first I was just going to put it on my 2'x10' pump island with 8" thick concrete and a couple of holes on each end about 3' deep. BUT, after seeing a previous topic about this,I changed my mind real quick. I am diging a 3'x5'deep hole in the center of my pump island now, with 3' long threaded rod for the ancors. We don't want the wind to blow our island away. I figure this will take about a yard and a half to two yards of concrete. i am sure other members that have done this will give there expert opinion on this. Joe
WANTED:::Barn Hangers...and other fine junk...
|
|
|
#56163
Wed Nov 23 2005 03:03 PM
|
Joined: May 2004
Posts: 84
Active Member
|
OP
Active Member
Joined: May 2004
Posts: 84 |
Thanks for the quick response guys,I may have gone overboard on my cement form ,2ft.square on top 4ft. square on bottom 6ft.tall,5ft. will be in the ground,1ft.will stick out of ground,plenty of re-rod& 4-1 inch threaded rods. Is it to late in the season to pour concrete in upstate N.Y.?
|
|
|
#56164
Wed Nov 23 2005 03:56 PM
|
Joined: Jul 2002
Posts: 1,095
Veteran Member
|
Veteran Member
Joined: Jul 2002
Posts: 1,095 |
I am sure Dave meant well when he suggested the Red Head anchors. I agree with his method, just not the brand. HILTI all the way. They are the ONLY brand of anchor on the market that can claim a Zero failure rate. That means they work! I am a little bias because I am the rep. for Hilti here in Memphis and have had the chance to sell both Red Head, Hilti, US anchor, and Rawl. Hilti by far and away is the best. Good luck. http://www.us.hilti.com/
|
|
|
#56165
Wed Nov 23 2005 03:59 PM
|
Joined: Mar 2002
Posts: 6,772 Likes: 1
Veteran Member
|
Veteran Member
Joined: Mar 2002
Posts: 6,772 Likes: 1 |
I'd rather error on the side of overkill than not have the concrete deep enough. 2' X 2' X 5' deep is definitely not too much concrete. That might be the minimum you'd want to go. Think of how much wind that big sign will catch. Also think of how much leverage the pole will provide. Threaded rod (with an "L" bent in them) extending deep into the concrete would be much better than anchors (consider the leverage factor) anchors don't extend deep enough into the concrete for this application. While it does take at least 28 days for concrete to fully cure it can have half its strength in 48 hours depending on mix and other factors so if you use threaded rod or L shaped anchor bolts you should be able to put your sign up after a few days. Its probably not too late to pour, but you need to make sure the concrete doesn't freeze. That means covering your pier and surrounding areas with visqueen and loose straw or even insulation.
[This message has been edited by Lastgas15 (edited 11-23-2005).]
Wanted: Gas pump globes:Sinclair & affiliates, IL companies. Ripple bodies. Anything Sinclair, Stoll, Pierce, 4 Bros. http://www.lastgas15.com/
|
|
|
#56166
Wed Nov 23 2005 04:21 PM
|
Joined: Oct 2005
Posts: 700
Petro Enthusiast
|
Petro Enthusiast
Joined: Oct 2005
Posts: 700 |
Sounds like Lastgas knows his mess about the concrete curing process. My father has been in waterway concrete construction(bulkheads, piers, bumpers, spans, fender systems, bridges, sub-structure, repair, pile driving) his whole working career, and I know that everything Lastgas said is correct. You definitely don't want it to freeze. And the slower you can cure concrete, the better. That means don't let it dry out too fast. Saturate the ground(sub-base) to slow the concrete curing process. Also a vibratory(tamping) to work out the air bubbles and bring the excess moisture to the top is ideal. Concrete is neat, and don't let it sit on your skin....... It will eat chu up!!! Good luck !!!
[This message has been edited by BBQ Chicken (edited 11-23-2005).]
|
|
|
#56167
Wed Nov 23 2005 10:36 PM
|
Joined: Dec 2000
Posts: 183
Petro Enthusiast
|
Petro Enthusiast
Joined: Dec 2000
Posts: 183 |
Rick, Freeze? Not a term we are familiar with here in SoCal. I will throw my two cents in. I would go for Galvanized "J" or "L" bolts, (over threaded rod),the longer the better. Any GOOD construction supply house should be able to come up with the bolts you need or give you some good leads. If not try AA Anchors or Cal-Fasteners, they should be able to direct you to a local source. Remember to leave enough thread above the pad that you can put a nut and washer under the sign base. This will make it a lot easier to plumb. After you have the sign plumb then fill the void with mortar. Don't forget to stub out some conduit for electric. Sounds like a great project. Ed
|
|
|
#56168
Wed Nov 23 2005 10:54 PM
|
Joined: Mar 2002
Posts: 6,772 Likes: 1
Veteran Member
|
Veteran Member
Joined: Mar 2002
Posts: 6,772 Likes: 1 |
I agree that J or L bolts would be better but they aren't the easiest things to find locally in the size needed for a sign post. 1/2" X 12" are about the biggest you normally see. 3/4" X 24" would be the minimum I'd use. Thats not overkill by any means. Like Ed said, don't forget to stub the conduit up. Even if you don't plan on using it now, you may change your mind later.
Wanted: Gas pump globes:Sinclair & affiliates, IL companies. Ripple bodies. Anything Sinclair, Stoll, Pierce, 4 Bros. http://www.lastgas15.com/
|
|
|
#56169
Thu Nov 24 2005 04:36 AM
|
Joined: Jan 2005
Posts: 2,702
Veteran Member
|
Veteran Member
Joined: Jan 2005
Posts: 2,702 |
BEING AN ELECTRICIAN FOR OVER 20 YEARS AND HAVING SET HUNDREDS OF LIGHTING POLE BASES. I'D GO WITH WHAT BOB SAID EXACTLY. ANCHORS HARDLY GO DEEP ENOUGH. YOU CAN GET THE J OR L BOLTS AT MOST ELECTRICAL WHOLESALE HOUSES OR FASTENER SHOPS. 18" - 24" IS BEST FOR THIS APPLICATION. USE REROD AND IF YOU DON'T DRIVE A GROUND ROD MAKE SURE TO PULL A GROUND WIRE OUT TO ISLAND OR BASE. NOTHING NICER THEN TO THESE SIGNS LIT AT NIGHT. ENJOY
DOUG
|
|
|
#56170
Thu Nov 24 2005 04:53 AM
|
Joined: Jul 2004
Posts: 1,036 Likes: 9
Veteran Member
|
Veteran Member
Joined: Jul 2004
Posts: 1,036 Likes: 9 |
Rick, I used L shaped anchor bolts on my sign, I believe they were two feet long. You will also need a 3/4" to 1" adaptor for a socket that will fit the nuts, you won't find a 3/4" drive socket big enough.If you have any trouble locating what you need, call your concrete supplier - they will know who you can contact for all your needs. Brady
|
|
|
|
|