Floor poured late fall. Got the electric, water, wiring, shop lights, some insulation, and some petro all in the last couple of months. Area in front of the workbench is for tearing down pumps, area in front of the workbench eventually gets a lift for wrenching on cars. The bar area at the end gets outfitted with 7-up stuff and a flat screen.