[Linked Image]This week the tin ceilings are being installed. Took for-frickin-ever to get the tin tiles made and delivered. Doing black in the main room and kitchen, also in the front two rooms of the station. White is going in the bathrooms in both buildings.

11_30_7.jpg 11_30_10.jpg 11_30_11.jpg
Last edited by DH44; Tue Nov 30 2021 09:08 PM.