Oldgas.com Home
Posted By: eric grinder G&B 665 Clock Face Hand Assembly Parts/ Pics Need - Mon Jun 19 2017 04:27 PM
I've been slowly finishing up this G&B 665 pump. I'm in need of the pieces that attach the clock hands to the threaded 2 step post as shown. If anyone has any of the parts that I need for sale please let me know. Or can someone at least post a picture of the assembly so I know what to look for. I've seen a few different way G&B would attach the a hands. But not pics of the individual parts. Haven't had much luck finding anything the correct size to thread onto either size on this post either. Also need 1 round face bezel. These measure just shy of 13" outside to outside across.

Attached picture gb44.jpg
pic 2

Attached picture gb55.jpg
Not even a picture anyone?
Eric,

sorry I didn't get back to you sooner but was out of town. Hope the attached pictures help. Let me know if you need more.

Attached picture IMG_1275.JPG
Attached picture IMG_1276.JPG
Thanks buddy! If anyone has this assembly NAME your price.
Eric, where you looking for a base for your 655? I jus came across one and can't remember who needed one
Hi. I believe that I have that part for the clock face.
© Primarily Petroliana Shop Talk