Was able to get a little work done on the bathrooms. The men’s room is going to get fresh paint and the old sink and toilet seem to be useable.
The ladies room “napkin” dispenser and paper towel holder may be salvageable too- going to take some detailed photos, then see if I can get the rust off and repaint them.
The bathroom door was installed today and I got it all caulked up- hope to get the wood primed tomorrow if real work allows it.
A piece of ridged glass will be ordered for the transom.
Still waiting on bay doors and glass.