Interesting Jack. The gentleman I got these projects from mentioned possibly the factory putting that in so I wasn't sure. The last company that used the two pumps I have that were sealed up with lead was ARCO. Pump doors both say 6-64 on the inside. I will say the lead work was nicely done because it wasn't only the holes that were filled but they went beyond that to blend those areas perfectly smooth. Was kind of cool burning it all out but at the same time I realized someone took some skill to put all that lead in.

lead-out1.jpg lead-out2.jpg bennett-doors.jpg
Last edited by fuelboy; Mon Jun 08 2020 09:37 PM.